Project Details:
Mechanical and Electrical design for installation of new chilled water system with one Multistack Turbocore chiller with a capacity of 320 tons of cooling, forced-draft cooling tower, pumps, piping, and cooling coils. Implementation of code required “Refrigeration Machinery Room Upgrade” including: ventilation system, refrigerant alarm system, emergency shutdown controls, refrigerant emergency release venting, and exiting requirements.
About the Facility:
Francisco Bay Office Park is a four-story office plaza located at the San Francisco Embarcadero.
Project Location:
50 Francisco St, San Francisco, CA 94133
Professional Services:
Systems:
Project Services:
Related