Livermore WWTP HVAC Systems
Project Details: HVAC design of Administration building, Solids Handling building, and Digester Control building. About the Facility: The Water Resources Division maintains approximately 267 miles of collection lines ranging in size from 6 inches to 48 inches in diameter. The sewage is conveyed by gravity to the Livermore Water Reclamation Plant. Approximately 4 to 7…