Industrial Facility Arc Flash – 96 Buses

About the Facility: Industrial sterile processing plant with laboratory facilities. Special Conditions: Diesel generator: redundant mains power supply with full load capacity. Automatic switching controls. Project Details: Complete facility electrical fault and arc flash study for 96 buses from utility point of connection inward with the goal of new arc flash labels with PPE requirements…

Industrial Facility Arc Flash – 8 Buses

About the Facility: Industrial sterile processing plant with laboratory facilities. Special Conditions: Diesel generator: redundant mains power supply with full load capacity. Automatic switching controls. Project Details: Complete facility electrical fault and arc flash study for 8 buses from utility point of connection inward with the goal of new arc flash labels with PPE requirements…

Industrial Facility Arc Flash – 90 Buses

Project Details: Complete facility electrical fault and arc flash study for 90 buses from utility point of connection inward with the goal of new arc flash labels with PPE requirements for hot work. Existing breaker settings examined for coordination and existing arc-flash hazards. New breaker settings and protection equipment proposed for better coordination and arc-flash…

Industrial Facility Arc Flash – 52 Buses

Project Details: Complete facility electrical fault and arc flash study for 52 buses from utility point of connection inward with the goal of new arc flash labels with PPE requirements for hot work. Existing breaker settings examined for coordination and existing arc-flash hazards. New breaker settings and protection equipment proposed for better coordination and arc-flash…

Industrial Facility Arc Flash – 72 Buses

About the Facility: Industrial sterile processing plant with laboratory facilities. Special Conditions: Diesel generator: redundant mains power supply with full load capacity. Project Details: Complete facility electrical fault and arc flash study for 72 buses from utility point of connection inward with the goal of new arc flash labels with PPE requirements for hot work.…

Industrial Facility Arc Flash – 151 Buses

About the Facility: Industrial sterile processing plant with laboratory facilities. Project Details: Complete facility electrical fault and arc flash study for 151 buses from utility point of connection inward with the goal of new arc flash labels with PPE requirements for hot work. Existing breaker settings examined for coordination and existing arc-flash hazards. New breaker…

Industrial Facility Arc Flash – 195 Buses

About the Facility: Industrial sterile processing plant with laboratory facilities. Project Details: Complete facility electrical fault and arc flash study for 195 buses from utility point of connection inward with the goal of new arc flash labels with PPE requirements for hot work. Existing breaker settings examined for coordination and existing arc-flash hazards. New breaker…

Livermore WWTP HVAC Systems

Project Details: HVAC design of Administration building, Solids Handling building, and Digester Control building. About the Facility: The Water Resources Division maintains approximately 267 miles of collection lines ranging in size from 6 inches to 48 inches in diameter. The sewage is conveyed by gravity to the Livermore Water Reclamation Plant. Approximately 4 to 7…

Livermore WWTP Laboratory HVAC

About the Facility: The Water Resources Division maintains approximately 267 miles of collection lines ranging in size from 6 inches to 48 inches in diameter. The sewage is conveyed by gravity to the Livermore Water Reclamation Plant. Approximately 4 to 7 million gallons per day (MGD) of treated wastewater is sent through the Livermore Amador…