Project Details:
Mechanical and Electrical design for installation of two centrifugal chillers with a total capacity of 900 tons of cooling capacity and two forced draft cooling towers for a total capacity of 2,160 GPM. Implementation of Code required “Refrigeration Machinery Room Upgrade” including: ventilation system, refrigerant alarm system, emergency shutdown controls, refrigerant emergency release venting, and exiting requirements.
About the Facility:
The building at 155 5th Street is a seven floor office building in downtown San Francisco housing the Wells Fargo facility.
Project Location:
155 5th Street, San Francisco, CA 94103
Professional Services:
Systems:
Project Services: