Project Details:
Mechanical and Electrical design for installation of six rotary chillers with a total cooling capacity of 930 tons of cooling and twelve forced-draft cooling towers serving buildings, A, B, C, D, E, and F. Implementation of code required “Refrigeration Machinery Room Upgrades” including: ventilation system, refrigerant alarm system, emergency shutdown controls, refrigerant emergency release venting, and exiting requirements.
About the Facility:
South Bay Center is a six-building office complex in San Jose, California.
Project Location:
2540 N 1st St, San Jose, CA 95131
Professional Services:
Systems:
Project Services:
Related